KEY BENEFITS
>Powerful automation controller eliminates the need for separate substation programmable logic controller
>High-end load shedding with multiple stages of frequency and voltage retains system stability after disturbances
>Fast optimal load shedding executed within 20ms minimizes process outages and costs associated with system downtime
>Intelligently sheds loads to maintain system/process integrity
>Highly customizable and scalable, integrating easily into most industrial plants with new or existing EMS/SCADA
>Customizable annunciator panel capable of handling up to 288 alarms eliminates the need for a separate panel
>High-end fault and disturbance recording eliminates the need for digital fault or disturbance recorders
>Synchronized phasor information according to IEEE® C37.118 standard for detection of system instability
>Increase network availability by reducing failover time to zero through IEC® 62439-3 “PRP” support
>HMI with pre-configured and customizable displays including real-time bay control, metering, fast load shed reports, equipment status, fault and event recording
APPLICATIONS
>Advanced bay control/monitoring (6 breakers and 30 disconnects)
>Fast, power-balance load shed
>Frequency and voltage load shed
>Substation alarm concentrator, annunciator, and controller
>Advanced automation schemes such as bus transfer
>Stand-alone breaker protection and monitoring